A snag is a small fault or a piece of unfinished work that needs putting right before a job is done. A chipped tile. A door that sticks. A socket faceplate that isn’t straight. Snagging is finding those faults, writing them down and getting them fixed. This guide covers what counts as a snag, who does the snagging, when it happens, and how it looks from the project manager’s side of a renovation job.

01What counts as a snag

A snag is anything that falls short of the agreed finish or the agreed scope. Most snags are small. They don’t stop the house being used, but the client is paying for them to be right.

  • Finish problems. Paint runs, patchy cutting in, scuffs, gaps in grout or silicone.
  • Fit problems. Doors that catch, drawers that don’t close, worktops not level, tiles out of line.
  • Things that don’t work. A dead socket, a dripping tap, a cold radiator, a rattling extractor.
  • Missing items. A cover plate not fitted, a threshold strip left off, a bead of sealant not done.
  • Damage from other trades. A scratched door frame, a dented skirting, plaster on a new floor.

A snag is not the same as a change. If the client asks for something that was never in the scope, such as an extra socket or a different tile, that is an extra. It needs pricing and agreeing before anyone does it. Mixing the two up is one of the main reasons jobs end in arguments.

02Who does the snagging

On a renovation, the project manager or the site foreman usually walks the job and makes the list. Sometimes the client walks it with you. On bigger jobs they may bring in someone independent.

Each trade should check their own work before they leave, but that is not the same as a snag walk. The person making the list needs to look at the whole job, including the joins between trades. That is where most problems hide.

The trades then fix the items on their part of the list. Someone has to check each fix and sign it off. In most small firms, that is the project manager again.

03When snagging happens

Snagging is often thought of as one walk at the end. In practice it works best as a few walks at set points in the job.

  • Pre-start. Walk the property before work begins. Record what is already there: cracks, damaged floors, old wiring, marks on walls you are not touching. This protects you later when someone asks who caused it.
  • Mid-job. Walk before things get covered up. Check first fix electrics and plumbing before plastering, and check the tray and waterproofing before tiling. A problem found now costs far less to put right than one found once it is boxed in.
  • Pre-handover. The main snag walk. Do it when the trades think they are finished, early enough that they can come back before the client moves in.
  • End of the defects period. Many contracts give a set period after handover in which the builder puts right defects that show up. Walk the job again at the end of it to catch cracks, settling and anything that has failed in use.

04Snagging and defects: the difference

People use the words loosely, but there is a useful difference. Snags are found before or at handover. They are things that were never quite right, or never finished.

Defects usually means faults that appear after handover, while the builder is still responsible for putting things right. A hairline crack where new plaster meets old, a weeping joint or a door that drops as the house dries out are typical.

Your contract decides what counts as a defect, how long you are responsible for them and how they are reported. Check it, and tell your client how it works before handover so nobody is surprised.

05The project manager’s view

For a PM on a renovation, snagging is less about finding faults and more about getting them closed. Finding them is the easy part. The hard part is everything after:

  • Turning notes, photos and voice memos into one list.
  • Working out which trade each item belongs to.
  • Getting each trade to understand exactly what is wrong and where.
  • Chasing the ones who don’t come back.
  • Checking the fix is actually done before you tell the client.
  • Keeping extras separate so they get priced, not done for free.

The list is also your record. If the client disputes something months later, a snag list with photos and dates shows what was found, who fixed it and when it was signed off.

06Making snagging quicker

The best snag walks are done in one go, room by room, with the photo taken the moment you spot the problem. Say what you see out loud. You will catch more than you would stopping to write after every item.

Snagwalk is built around that. You start a walk, talk and take photos, and it turns the recording into snags sorted by trade, extras for the client to approve, and the things you signed off. Each trade gets a link with only their items and marks them fixed with a photo. You sign each fix off or send it back. Your first 3 walks are free.

Your next walk, sorted.

Snagwalk is on Google Play now. The App Store version is on its way.

Get it onGoogle PlayApp StoreComing soon